This hydrocarbon processing plant project consists of several imposing structures, including pipe racks, a process platform which is 14 meters high and supports more than 120 tonnes of equipment, a 42-tonne process column which is 44 meters high and built on nine-meter long pile foundations, etc.
Location:
SERBIAScope:
- Structural Engineering
- Connection Design
- Steel Detailing