The design of this sugar factory compound covered, in addition to the main production building, a steel platform for carrying the juice heaters, other equipment and pipes. The steel platform is 25m high. The weight of the equipment is in excess of 100t. The total weight of the steel structure exceeds 55t.
Location:
SerbiaScope:
- Complete structural engineering of steel and concrete structure

Check out our other projects
Do not hesitate to contact us for any business proposal!