Reliable & Fast Highest Standards Modern & Proven Solutions

Steel roof structure of existing building and canopy in front of the building. The client defined the minimum height clearance due to the possibility of manipulating the vehicle under the canopy, and the walls of the existing building defined the height in the ridge. The adopted system consists of 3 columns and the spans are 9.5x9m.

Location:

Serbia

Scope:

  • Architectural design
  • Structural design
  • Connection design
  • 3D BIM modelling
  • Steel detailing
Roof truss design
Tim Global Engineering
Check out our other projects
Do not hesitate to contact us for any business proposal!
© 2024 Copyright Tim Global Engineering. All rights reserved. Design by Popart Studio