Reliable & Fast Highest Standards Modern & Proven Solutions

Independent external control of the structural and connection designs for this 15m long steel footbridge. The evaluation of buckling length for the steel truss top chord was the biggest issue in terms of reviewing the design that had been done by our client. All elements of the footbridge were checked according to relevant Australian and New Zealand structural steel standards. The connections were also checked by using nonlinear FEA methods.

Location:

New Zealand

Scope:

  • Structural design
  • Connection design
Tim Global Engineering
Check out our other projects
Do not hesitate to contact us for any business proposal!
© 2024 Copyright Tim Global Engineering. All rights reserved. Design by Popart Studio